(81)
(79)
(80)
Flow control is a function that prevents network congestion by ensuring that(71)do not overwhelm(72)with data. There are three commonly used methods for handling network congestion.(73)is used by network devices to temporarily store bursts of excess data in memory until they can be processed. (74)are used by receiving devices to help prevent their buffers from overflowing.(75)is a flow -control scheme in which the source device requires an acknowledgment from the destination after a certain number of packets have been transmitted.
(78)
(76)
(75)
(73)
(74)
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (66) of the technical requirements for the software product.
During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform. and each (67) that it must meet. The starting point is usually a set of high-level requirements from the (68) that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and the defines (69) showing how the system will be operated, publishes the system and operation concept documents,and conducts a system concept review(SCR).
Following the SCR, the team derives (70) requirements for the system from the highlevel requirements and the system operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirements.
2017年软考初级信息系统运行管理员
2017年软考初级信息系统运行管理员
2017年软考初级信息系统运行管理员
2017年信息系统运行管理员模拟题(
2017年信息系统运行管理员模拟题(
2017年信息系统运行管理员模拟题(
信息系统运行管理员2017年考试题及
2006年信息系统运行管理员上午试卷
2006年上半年《信息系统运行管理员
2017年软考初级网络管理员模拟试题