Cracks may be prevented from developing at the corners of welded plating inserts by ______.
That BE IT KNOWN THAT MV GLUCKAULF UNDER MY COMMAND HAS A DWC OF 12,431 M/T ON SUMMER LOADLINE,AND A BALE CAPACITY OF 18,439 CU.M.AND A GRAIN CAPACITY OF 19,941 CU.M.is likely to be the wording of ______.
Tensile stress is a result of two forces acting in ______.
A vessel loads 100 tons of glass jars. The mate on watch discovers that some of the cartons have been damaged and has an exception made on the Bill of Lading. What is this document called?
That the Shipowner has broken a condition precedent will ______ the Charterer from the liability to provide a cargo.
Any vessel that does not have the necessary certificates on board will ______ the Panama Canal.
If the Shipowner proves that prima facie the cause of damage was excepted,the burden of proof shifts to ______.
Deviation to save ______ is always justified,unless it is expressly stipulated otherwise.
The distance between the surface of the water and the tidal datum is the ______.
A patient in shock should NOT be placed in which position?
GMDSS题库试题(1)
GMDSS题库试题(2)
GMDSS题库试题(3)
GMDSS题库试题(4)
GMDSS题库试题(5)
GMDSS试题练习(1)
GMDSS试题练习(2)
GMDSS试题练习(3)
GMDSS试题练习(4)
GMDSS试题练习(5)