关于TCP/IP与OSI模型的说法中,正确的是(24)。
(81)
(79)
(80)
Flow control is a function that prevents network congestion by ensuring that(71)do not overwhelm(72)with data. There are three commonly used methods for handling network congestion.(73)is used by network devices to temporarily store bursts of excess data in memory until they can be processed. (74)are used by receiving devices to help prevent their buffers from overflowing.(75)is a flow -control scheme in which the source device requires an acknowledgment from the destination after a certain number of packets have been transmitted.
(78)
(76)
(75)
(73)
(74)
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (66) of the technical requirements for the software product.
During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform. and each (67) that it must meet. The starting point is usually a set of high-level requirements from the (68) that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and the defines (69) showing how the system will be operated, publishes the system and operation concept documents,and conducts a system concept review(SCR).
Following the SCR, the team derives (70) requirements for the system from the highlevel requirements and the system operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirements.
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)