单选

以下Windows命令中,可以用于验证端系统地址的是(52);可以用于识别分组传送路径的是(53);如果要终止一个ping会话,正确的操作是(54)。以下应用中,对网络带宽性能影响最大的应用上(55)。OSPF和RIP都是Internet中的路由协议,与RIP相比,OSPF有许多优点,但(56)不是OSPF的优点。

  • A.ping
  • B.arp-a
  • C.tracert
  • D.telner
试题出自试卷《软件水平考试(中级)网络工程师上午(基础知识)试题模拟试卷31》
参考答案
查看试卷详情
相关试题
  1. (81)

    • A.Buffer
    • B.Source-quench messages
    • C.Buffering
    • D.Windowing
  2. (79)

    • A.Buffer
    • B.Source-quench messages
    • C.Buffering
    • D.Windowing
  3. (80)

    • A.Buffer
    • B.Source-quench messages
    • C.Buffering
    • D.Windowing
  4. Flow control is a function that prevents network congestion by ensuring that(71)do not overwhelm(72)with data. There are three commonly used methods for handling network congestion.(73)is used by network devices to temporarily store bursts of excess data in memory until they can be processed. (74)are used by receiving devices to help prevent their buffers from overflowing.(75)is a flow -control scheme in which the source device requires an acknowledgment from the destination after a certain number of packets have been transmitted.

    • A.transmitting devices
    • B.transmitted devices
    • C.receiving devices
    • D.received devices
  5. (78)

    • A.transmitting devices
    • B.transmitted devices
    • C.receiving devices
    • D.received devices
  6. (76)

    • A.detailed
    • B.outlined
    • C.total
    • D.complete
  7. (75)

    • A.rules
    • B.principles
    • C.scenarios
    • D.scenes
  8. (73)

    • A.criterion
    • B.standard
    • C.model
    • D.system
  9. (74)

    • A.producer
    • B.customer
    • C.programmer
    • D.analyser
  10. The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (66) of the technical requirements for the software product.

     During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform. and each (67) that it must meet. The starting point is usually a set of high-level requirements from the (68) that describe the project or problem.

     In either case, the requirements definition team formulates an overall concept for the system and the defines (69) showing how the system will be operated, publishes the system and operation concept documents,and conducts a system concept review(SCR).

     Following the SCR, the team derives (70) requirements for the system from the highlevel requirements and the system operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirements.

    • A.function
    • B.definition
    • C.specification
    • D.statement