一起答
单选

老王开发了一种控制汉字输入方法的应用软件,后老王于2000年3月10日去世了。该软件的保护期应截止到(22)。

  • A.2050年12月31日
  • B.2050年3月10日
  • C.2000年3月10日
  • D.2000年12月31日
参考答案
查看试卷详情
相关试题
  1. (79)

    • A.gain
    • B.gained
    • C.gains
    • D.gaining
  2. (78)

    • A.insiders
    • B.money
    • C.outsiders
    • D.warehouse
  3. (77)

    • A.close
    • B.closed
    • C.enclose
    • D.enclosed
  4. Soon, more of the information we receive via the Internet could come(71)in digital wrappers.

    Wrappers are made up(72)software code that's targeted to do specific things with the data(73)within them, such as helping to define queries for search engines. They also keep(74)from(75)access to that code.

    • A.package
    • B.packaged
    • C.packages
    • D.packaging
  5. (76)

    • A.of
    • B.off
    • C.on
    • D.out
  6. (73)

    • A.college
    • B.family
    • C.workshop
    • D.cottage
  7. (74)

    • A.plan
    • B.schedule
    • C.effort
    • D.product
  8. Developing reliable software on time and within(66)represents a difficult endeavor for many organizations.

    Usually business solutions have three main aspects: people,(67),and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process(68). Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool !"

    Structured method was the first wave of the software industry. This was the beginning of transforming software development from a"(69)industry" to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry :"software industrialization". Software development will become like an assembly and manufacturing process. A cfiticalenabling factor is adisciplined software engineering . process with predictable quality,(70)and functionality.

    • A.forecast
    • B.preparation
    • C.budget
    • D.economy
  9. (71)

    • A.process
    • B.skill
    • C.organization
    • D.interface
  10. (72)

    • A.law
    • B.discipline
    • C.plan
    • D.evaluation