一起答
单选

分治法也许是使用最广泛的算法设计方法,以下关于分治法的结论中正确的是(54)。

  • A.分治法能解决动态规划方法所能解决的任何问题
  • B.分治法找到的问题的解一定是最优解
  • C.用分治法能求出任何问题的解
  • D.分治法只能把大问题简单分解成一些较小的问题
参考答案
查看试卷详情
相关试题
  1. (79)

    • A.gain
    • B.gained
    • C.gains
    • D.gaining
  2. (78)

    • A.insiders
    • B.money
    • C.outsiders
    • D.warehouse
  3. (77)

    • A.close
    • B.closed
    • C.enclose
    • D.enclosed
  4. Soon, more of the information we receive via the Internet could come(71)in digital wrappers.

    Wrappers are made up(72)software code that's targeted to do specific things with the data(73)within them, such as helping to define queries for search engines. They also keep(74)from(75)access to that code.

    • A.package
    • B.packaged
    • C.packages
    • D.packaging
  5. (76)

    • A.of
    • B.off
    • C.on
    • D.out
  6. (73)

    • A.college
    • B.family
    • C.workshop
    • D.cottage
  7. (74)

    • A.plan
    • B.schedule
    • C.effort
    • D.product
  8. Developing reliable software on time and within(66)represents a difficult endeavor for many organizations.

    Usually business solutions have three main aspects: people,(67),and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process(68). Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool !"

    Structured method was the first wave of the software industry. This was the beginning of transforming software development from a"(69)industry" to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry :"software industrialization". Software development will become like an assembly and manufacturing process. A cfiticalenabling factor is adisciplined software engineering . process with predictable quality,(70)and functionality.

    • A.forecast
    • B.preparation
    • C.budget
    • D.economy
  9. (71)

    • A.process
    • B.skill
    • C.organization
    • D.interface
  10. (72)

    • A.law
    • B.discipline
    • C.plan
    • D.evaluation