单选

浮点数加法中,首先必须对阶,使二数阶码相等,才能进行加法运算,对阶时要求(5),尾数相加后还需对尾数进行规格化、含入等处理,才能得到运算结果。如果判断浮点加法结果溢出,可判断(6)。

  • A.大阶变成小阶
  • B.小阶变成大阶
  • C.尾数是规格化数
  • D.不须改变阶的大小
参考答案
查看试卷详情
相关试题
  1. (79)

    • A.gain
    • B.gained
    • C.gains
    • D.gaining
  2. (78)

    • A.insiders
    • B.money
    • C.outsiders
    • D.warehouse
  3. (77)

    • A.close
    • B.closed
    • C.enclose
    • D.enclosed
  4. Soon, more of the information we receive via the Internet could come(71)in digital wrappers.

    Wrappers are made up(72)software code that's targeted to do specific things with the data(73)within them, such as helping to define queries for search engines. They also keep(74)from(75)access to that code.

    • A.package
    • B.packaged
    • C.packages
    • D.packaging
  5. (76)

    • A.of
    • B.off
    • C.on
    • D.out
  6. (73)

    • A.college
    • B.family
    • C.workshop
    • D.cottage
  7. (74)

    • A.plan
    • B.schedule
    • C.effort
    • D.product
  8. Developing reliable software on time and within(66)represents a difficult endeavor for many organizations.

    Usually business solutions have three main aspects: people,(67),and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process(68). Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool !"

    Structured method was the first wave of the software industry. This was the beginning of transforming software development from a"(69)industry" to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry :"software industrialization". Software development will become like an assembly and manufacturing process. A cfiticalenabling factor is adisciplined software engineering . process with predictable quality,(70)and functionality.

    • A.forecast
    • B.preparation
    • C.budget
    • D.economy
  9. (71)

    • A.process
    • B.skill
    • C.organization
    • D.interface
  10. (72)

    • A.law
    • B.discipline
    • C.plan
    • D.evaluation