Results of quality control measurement are used(75) .
On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating. Activity duration estimating and(74) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.
During the risk analysis process, it is determined that one identified risk event cannot be avoided, mitigated, or insured. This risk event is a critical item that could cause the project to fail if it occurs. The best option for the project manager is to:(73) .
(72) is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
In fixed price contract which of the following holds true?(71) .
(77)
某工程包括A、B、C、D、E、F、G 7个作业,各个作业的紧前作业、所需时间、所需人数如表5-1所示。
该工程的计算工期为(66)周。按此工期,整个工程至少需要(67)人。
沟通是项目管理的一项重要工作,如图5-2所示为人与人之间的沟通模型。该模型说明了沟通的发送者收集信息、对信息加工处理、通过通道传送、接受者接收并理解、接受者反馈等若干环节。由于人们的修养和表达能力的差别,在沟通时会产生各种各样的障碍。语义障碍最常出现在(59),认知障碍最常出现在(60)。
(75)
在大型项目或多项目实施的过程中,负责实施的项目经理对这些项目大都采用(57)的方式。投资大、建设周期长、专业复杂的大型项目最好采用(58)的组织形式或近似的组织形式。
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)