以下关于软件需求分析和软件设计的叙述中,不正确的是( )。

  • A.需求分析可以检测和解决需求之间的冲突, 并发现系统的边界
  • B.软件设计是根据软件需求, 产生一个软件内部结构的描述, 并将其作为软件构造的基础
  • C.需求分析是为了评价和改进产品质量、识别产品的缺陷和问题而进行的活动
  • D.软件设计是为了描述出软件架构及相关组件之间的接口
参考答案
查看试卷详情
相关试题
  1. The key benefit of( )is that it provides guidance and direction on how the project costs will be managed throughout the project.

    • A. Plan Cost Management
    • B. Control Cost
    • C. Estimate Cost
    • D. Determine Budget
  2. For anyinformation system to serve its purpose ,the ihformation must be( )when it ìs needed.

    • A.integral
    • B.availab1e
    • C.irreplaceable
    • D.confidential
  3. ( )is a project management technique for measuring project performance progress.It has the ability to combine measurements of the project management triangle: scope,time and costs.

    • A.Critica1 path method(CPM)
    • B.Earned value management(CEV)
    • C.Net present value method(NPVM)
    • D.Expert judgment method(EJM)
  4. ( )The capability provided to the consumer is to use the provide's applications running on a c1oud infrastructure.The applications are accessible from various client devices through either a thin client interface, such as a web browser (e.g.,web-based E-mai1),or a program interface.

    • A.IaaS
    • B.PaaS
    • C.SaaS
    • D.DaaS
  5. ( ) refers to the application of the Internet and other information techno1ogy in conventiona1 industries. It is an incomplete equation where various Internets (mobi1e Internet ,cloud computing ,big data or Internet of Things)can be added to other fields, fostering new industries and business development.

    • A.Internet plus
    • B.Industry 4.0
    • C.Big data
    • D.Cloud computing
  6. 通过招标过程确定中标人后,实施合同内的合同价款应为( )。

    • A.招标预算价
    • B.中标者的投标价
    • C.所有投标价的均价
    • D.评标委员会综合各方面因素后给出的建议价
  7. ( )不属于知识产权的基本特征。

    • A.时间性
    • B.地域性
    • C.专有性
    • D.实用性
  8. 某项目承包者预计该项目有0.5的概率获利200000美元,0.3的概率亏损50000美元,还有0.2的概率维持平衡.该项目的期望货币价值为( )美元。

    • A.200000
    • B.85000
    • C.50000
    • D.180000
  9. 风险预测从两个方面来评估风险,即( )和风险发生可能带来的后果。

    • A.风险原因分析
    • B.风险发生的时间
    • C.风险应对措施
    • D.风险发生的可能性
  10. 项目面临的各种风险中,( )对客户的影响最为深远。

    • A.范围风险
    • B.进度风险
    • C.成本风险
    • D.质量风险