( )不属于项目验收的内容。

  • A.验收测试
  • B.系统维护工作
  • C.项目终验
  • D.系统试运行
参考答案
查看试卷详情
相关试题
  1. The key benefit of( )is that it provides guidance and direction on how the project costs will be managed throughout the project.

    • A. Plan Cost Management
    • B. Control Cost
    • C. Estimate Cost
    • D. Determine Budget
  2. For anyinformation system to serve its purpose ,the ihformation must be( )when it ìs needed.

    • A.integral
    • B.availab1e
    • C.irreplaceable
    • D.confidential
  3. ( )is a project management technique for measuring project performance progress.It has the ability to combine measurements of the project management triangle: scope,time and costs.

    • A.Critica1 path method(CPM)
    • B.Earned value management(CEV)
    • C.Net present value method(NPVM)
    • D.Expert judgment method(EJM)
  4. ( )The capability provided to the consumer is to use the provide's applications running on a c1oud infrastructure.The applications are accessible from various client devices through either a thin client interface, such as a web browser (e.g.,web-based E-mai1),or a program interface.

    • A.IaaS
    • B.PaaS
    • C.SaaS
    • D.DaaS
  5. ( ) refers to the application of the Internet and other information techno1ogy in conventiona1 industries. It is an incomplete equation where various Internets (mobi1e Internet ,cloud computing ,big data or Internet of Things)can be added to other fields, fostering new industries and business development.

    • A.Internet plus
    • B.Industry 4.0
    • C.Big data
    • D.Cloud computing
  6. 通过招标过程确定中标人后,实施合同内的合同价款应为( )。

    • A.招标预算价
    • B.中标者的投标价
    • C.所有投标价的均价
    • D.评标委员会综合各方面因素后给出的建议价
  7. ( )不属于知识产权的基本特征。

    • A.时间性
    • B.地域性
    • C.专有性
    • D.实用性
  8. 某项目承包者预计该项目有0.5的概率获利200000美元,0.3的概率亏损50000美元,还有0.2的概率维持平衡.该项目的期望货币价值为( )美元。

    • A.200000
    • B.85000
    • C.50000
    • D.180000
  9. 风险预测从两个方面来评估风险,即( )和风险发生可能带来的后果。

    • A.风险原因分析
    • B.风险发生的时间
    • C.风险应对措施
    • D.风险发生的可能性
  10. 项目面临的各种风险中,( )对客户的影响最为深远。

    • A.范围风险
    • B.进度风险
    • C.成本风险
    • D.质量风险