一起答
单选

智慧城市建设参考模型包括有依赖关系的5 层结构和对建设有约束关系的3 个支撑体系,5 层机构包括物联感知层、通信网络层、计算与储存层、数据及服务支持层、智慧应用层;3 个支持体系除了建设和运营管理体系、安全保障体系之外还包括()

  • A.人员自愿调配体系
  • B.数据管理体系
  • C.标准规范体系
  • D.技术研发体系
参考答案
查看试卷详情
相关试题
  1. Human resource management is the management of human resources. It is function in organization designed to maximize employee         in service of an employer’s strategic objectives.

    • A.work
    • B.job
    • C.scope
    • D.performance
  2. For any information system to serve its purpose,the information must be () when it is needed.

    • A.integral
    • B.available
    • C.irreplaceable
    • D.confidential
  3. ()is a project management technique for measuring project performance and progress.It has the ability to combine measurements of the project management triangle: scope , time and costs.

    • A.Critical path method(CPM)
    • B.Earned value management(EVM)
    • C.Net present value method (NPVM)
    • D.Expert judgment method(EIM)
  4. ( ) :refers to the application of the internet and other informatio technology in conventional industries.It is an incomplete equation where various Internets (mobile Internet,cloud computing,big data or Internet of things) can be added to other fileds, fostering new industries and business development.

    • A.internet plus
    • B.industry 4.0
    • C.Big data
    • D.Cloud computing
  5. 通过招标过程确定中标人后,实施合同内的合同价款应为()

    • A.招标预算价
    • B.中标者的投标价
    • C.所有投标价的均价
    • D.评标委员会综合各方面因素后给出的建议价
  6. ():The capability provided to the consumer is to use the provider’s applications running on a cloud infrastructure,The applications are accessible from various client devices through either a thin client interface, such as a web browser (e.g.,web-based E-mail),or a program interface.

    • A.laaS
    • B.PaaS
    • C.SaaS
    • D.DaaS
  7. 数字签名技术属于信息系统安全管理中保证信息()的技术。

    • A.保密性
    • B.可用性
    • C.完整性
    • D.可靠性
  8. ()不属于知识产权的基本特征。

    • A.时间性
    • B.地域性
    • C.专有性
    • D.实用性
  9. 某项目承包者预计该项目有0.5 的概率获利200000 美元。0.3 的概率亏损50000 美元,还有0.2 的概率维持平衡。该项目的期望货币价值为()美元。

    • A.200000
    • B.85000
    • C.50000
    • D.180000
  10. 风险预测从两个方面来评估风险,即()和风险发生可能带来的后果。

    • A.风险原因分析
    • B.风险发生的时间
    • C.风险应对措施
    • D.风险发生的可能性