甲公司与乙公司订立了一份总货款额为20万元的设备供货合同。合同约定的违约金为货款总额总值的10%。同时,甲公司向乙公司给付定金5000元。后乙公司违约,给甲公司造成损失2万元。乙公司依法向甲公司支付违约金____万元。
All of followings should be done by the project manager during project control except
Modern computers based on ( ) are millions to billions of times more capable than the early computers, which occupy a fraction of the space. Simple computers are small enough to fit into mobile devices, an mobile computers can be powered by small batteries. Personal computers in their various forms are icons of the Information Age and are what most people think of as ‘computers’.
Which of following is an important input to scope verification?
( ) is the use of computing resources (hardware and software) that a delivered as a service over a network (typically the Internet).
The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions is called
以下关于项目变更控制委员会的描述中____是正确的。
变更管理的工作程序包括:接受变更申请、对变更的初审、____、CCB决定是否批准、发出变更通知并开始实施、变更实施监控、变更效果评估。
公民为完成法人或者其它组织工作任务所创作的作品是职务作品,对于主要是利用法人或者其它组织的物质技术条件创作,并由法人或者其它组织承担责任的工程设计图、产品设计图、地图、计算机软件等职务作品,其
应用Paretol图可以
____一般不是用于质量控制的方法和技术。
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)