一个为期2年的项目已经实施了1年,在项目期间不同的项目成员进进出出,团队成员已经发生了较大的变化,而相应的团队职责分工也已经与原计划有了很多出入。最近团队成员在为一个工作包由谁来负责产生了分歧,项目经理查看了项目计划,他发现很多工作包都没有规定负责人,或者是原定的负责人已经发生了变更。针对这种情况,项目经理应该首先()以加强对项目的管控。
The customer asks your project to be completed 6 months earlier than planned.You think this target can be reached by-overlapping project activities. This approach is known as ().
The auditing function that provides feedback about the quality of output is referred to as ().
()is not included in the main contents of the operation and maintenance of the information system.
WLAN is increasingly popular because it enables cost-effective () among people and applications that were not possible in the past.
In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the project deliverables. ()are not output of activity definition.
在质量控制过程中,经常会使用一些工具和方法。(1)是一种基于80/20原理,用于找出影响项目产品或服务质量的主要因素的方法。(2)不属于质量控制活动。
知识产权作为法律所确认的知识产品所有人依法享有的民事权利,其管理的要项中不包括()。
在制定项目质量计划过程中,可以采用()方法以识别哪些因素会对特定变量产生影响。
配置项的状态可分为“草稿”、“正式”和“修改”三种。以下关于配置项状态的叙述中,不正确的是:()。
以下关于质量管理的叙述中,不正确的是:()。
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)