一起答
单选

●IEEE制订了以太网的相关技术标准,其中1000B

  • ●IEEE制订了以太网的相关技术标准,其中1000Base-X(光纤吉比特以太网)遵循的标准为(21)。    (21)A.802.3   
  • B.802.3u   
  • C.802.3z   
  • D.802.3ab
试题出自试卷《2012年下半年软考《系统集成项目管理工程师》上午试卷(参考答案版)》
参考答案
查看试卷详情
相关试题
  1. ●Sever

    • ●Several risk response strategies are available.(75) the risk simply gives another party responsibility for its management,it does not eliminate risk.    (75) A. Avoiding  
    • B. Mitigating  
    • C. Accepting  
    • D. Transferring
  2. ●M

    • ●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).&nb
    • B. project baseline
    • C. risk response plan   
    • D. risk baseline
  3. ●The project budget h

    • ●The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope.(74) could provide the fund to cover the newly discovered work item.    (74) A. Contingency reserve 
    • B. Project profit
    • C. Management reserve         
    • D. Special fund
  4. ●质量保证部门最近对某项目进行了质最审计,给出了一些建议和裁定。一项建议看来很关键且应该被执行,因为它将影响到这个项目是否能成功地交给客户。如果建议不被执行,产品则不能满足需要。该项目的项目经理下一步应该(70)。

    (70)

    • ●质量保证部门最近对某项目进行了质最审计,给出了一些建议和裁定。一项建议看来很关键且应该被执行,因为它将影响到这个项目是否能成功地交给客户。如果建议不被执行,产品则不能满足需要。该项目的项目经理下一步应该(70)。    (70)A.开一个项目团队会议,以确定谁对这个问题负责
    • B.重新分配任务给没能发现这个错误负有责任的队员
    • C.立即执行产品返工
    • D.发布一个变更申请以执行需要的纠正活动
  5. ● 

    • ● A test case normally consists of a unique identifier, requirement references from a design specification, events, a series of steps to follow,input, output, actual result, and (71)     (71)A. bug   
    • B. expected result
    • C. test report   
    • D. traceability matrix
  6. ●The Systems Development Life Cycle (SDLC) is

    • ●The Systems Development Life Cycle (SDLC) is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as (72), focus on complete and correct p
    • B. Extreme Programming
    • C. Spiral   
    • D. Rapid Prototyping
  7. ●下列说法不正确的是(68)。

    (68)

    • ●下列说法不正确的是(68)。    (68)A.招标投标法规定招标方式分为公开招标和邀请招标两类
    • B.只有不属于法规规定必须招标的项目才可以采用直接委托方式
    • C.建设行政主管部门派人参加开标、评标、定标的活动,监督招标按法定程序选择中标人;所派人员可作为评标委员会的成员,但不得以任何形式影响或干涉招标人依法选择中标人的活动
    • D.比较而言公开招标的评标工作量较大,所需招标时间长,费用高
  8. ●(69)不是质量控制的方法、技术和工具。

    (69)

    • ●(69)不是质量控制的方法、技术和工具。    (69)A.趋势图   
    • B.检查表   
    • C.控制图   
    • D.制定参照基准表
  9. ●在各种绩效报告工具或技巧中,通过(66)方法可综合范围、成本(或资源)和进度信息作为关键因素。

    (66)

    • ●在各种绩效报告工具或技巧中,通过(66)方法可综合范围、成本(或资源)和进度信息作为关键因素。    (66)A.绩效评审   
    • B.趋势分析   
    • C.偏差分析   
    • D.挣值分析
  10. ●某公司现有的职员能轻易满足某新项目的一部分要求,但是这个项目的其他方面对该公司来说是新的。项目经理经过调研了解到一些供应商专业生产这类产品,可能能满足项目很多或全部需要。项目经理在准备项目计划和决定怎样招聘最佳人选及处理所需要的资源时,首先应该(67) 。

    (67)

    • ●某公司现有的职员能轻易满足某新项目的一部分要求,但是这个项目的其他方面对该公司来说是新的。项目经理经过调研了解到一些供应商专业生产这类产品,可能能满足项目很多或全部需要。项目经理在准备项目计划和决定怎样招聘最佳人选及处理所需要的资源时,首先应该(67) 。    (67)A.进行自制/外购分析
    • B.进行市场调查
    • C.通过邀请提交建议书(RFP)向供应商征求方案来决定是否将项目外包出去
    • D.评审公司采购部门提供的合格的卖方名单,并向选定的卖方发邀请提交建议书