● 工程项目实施阶段出现(57) 情况时,总监理工程师有权下达停工令。
①擅自变更设计及开发方案而自行实施、开发
②未经技术资质审查的人员进入现场实施、开发
③隐蔽作业(指综合布线及系统集成中埋入墙内或地板下的部分)未经现场监理人员查验自行封闭、掩盖
④将 W 点确定为软件开发关键工序,约定时间监理工程师未到现场检查而进行该 W点的实施
(57)
● Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. As change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identification of significant states within the revision history of a configuration item is the central purpose of (75) identification.
(75)
●(73)operate by distributing a workload evenly over multiple back end nodes. Typically the cluster will be configured with multiple redundant load-balancing front ends.
(73)
●A PM wanted to show management,visually, how quality controls were affecting processes. The best tool to accomplish this is(74) .
(74)
● 若某小型信息系统开发团队由4人组成,则其沟通渠道数为(70)
(70)
● In software engineering and systems engineering,(71) is a description of a system's behavior. as it responds to a request that originates from outside of that system.
(71)
●The standard (IEEE 802) format for printing (72) in human-friendly form. is six groups of two hexadecimal digits, separated by hyphens (-) or colons (:), in transmission order, e.g. 01-23-45-67-89-ab, 01:23:45:67:89:ab. This form is also commonly used for EUI-64.
(72)
● 企业质量体系主要是满足(68)的需要。
(68)
● 软件著作权的客体是指 (69) 。
(69)
● 下列关于关键工作的叙述,错误的是(66) 。
(66)
● 监理控制工程进度的措施不包括(67) 措施。
(67)
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)