一起答
单选

● 从既节省投资又保障性能角度考虑,(5)可以采用入门级服务器。

(5)

  • A. 打印服务器           
  • B. 视频会议服务器
  • C. 办公自动化系统(OA)服务器   
  • D. 网络游戏服务器
参考答案
查看试卷详情
相关试题
  1. ● Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. As change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identification of significant states within the revision history of a configuration item is the central purpose of (75) identification. 

    (75)

    • A. baseline    
    • B. value          
    • C.cost        
    • D. control
  2. ●A PM wanted to show management,visually, how quality controls were affecting processes. The best tool to accomplish this is(74) .

    (74)

    • A. Diagrams  
    • B. Histograms 
    • C. Flowcharts 
    • D. Control charts
  3. ●(73)operate by distributing a workload evenly over multiple back end nodes. Typically the cluster will be configured with multiple redundant load-balancing front ends. 

    (73)

    • A. High-availability clusters      
    • B. Load-balancing clusters
    • C. Grid computing            
    • D. Cloud Computing
  4. ●The standard (IEEE 802) format for printing (72) in human-friendly form. is six groups of two hexadecimal digits, separated by hyphens (-) or colons (:), in transmission order, e.g. 01-23-45-67-89-ab, 01:23:45:67:89:ab. This form is also commonly used for EUI-64.

    (72)

    • A. hard disk logical block address 
    • B. IP address
    • C. mail address           
    • D. MAC address
  5. ● 若某小型信息系统开发团队由4人组成,则其沟通渠道数为(70)

    (70)

    • A. 12         
    • B. 10        
    • C. 8         
    • D. 6
  6.  ● In software engineering and systems engineering,(71) is a description of a system's behavior. as it responds to a request that originates from outside of that system. 

    (71)

    • A. black box       
    • B. business rule
    • C. use case            
    • D. traceability matrix
  7. ● 监理控制工程进度的措施不包括(67) 措施。

    (67)

    • A.组织      
    • B.技术  
    • C.信息管理    
    • D.知识产权管理
  8. ● 企业质量体系主要是满足(68)的需要。

    (68)

    • A.质量管理  
    • B.认证  
    • C.顾客        
    • D.认证与顾客
  9. ● 监理机构在实施信息化工程监理时,应对(64) 进行控制。

    (64)

    • A.施工质量、施工工期和施工成本
    • B.工程项目的功能、使用要求和质量
    • C.工程项目投资方向和投资结构
    • D.工程质量、工程工期和工程建设资金使用
  10. ● 项目监理机构应当根据(65)开展监理活动。

    (65)

    • A.项目法人的要求    
    • B.监理合同
    • C.监理大纲        
    • D.招标文件