● 监理合同是指委托人与监理单位就委托的工程项目管理内容签订的明确双方权利和义务的协议。(42)不属于监

理单位的义务或职责,(43)不属于监理单位的权利。

 (42)A.合同履行过程中如需更换总监理工程师,必须首先经过委托方同意

B.不得与被监理项目的承建单位存在隶属关系或利益关系

C.当业主方与承建单位发生争议时,监理应根据自己职能进行调解,最大程度地维护业主方的利益

D.在合同终止后,未征得有关方同意,不得泄露与本工程合同业务相关的保密资料

 (43)

  • A.对实施项目的质量、工期和费用的监督控制权
  • B.完成监理任务后获得酬金的权利
  • C.对承建单位的选定权
  • D.终止合同的权利
参考答案
查看试卷详情
相关试题
  1. ● Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. As change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identification of significant states within the revision history of a configuration item is the central purpose of (75) identification. 

    (75)

    • A. baseline    
    • B. value          
    • C.cost        
    • D. control
  2. ●A PM wanted to show management,visually, how quality controls were affecting processes. The best tool to accomplish this is(74) .

    (74)

    • A. Diagrams  
    • B. Histograms 
    • C. Flowcharts 
    • D. Control charts
  3. ●(73)operate by distributing a workload evenly over multiple back end nodes. Typically the cluster will be configured with multiple redundant load-balancing front ends. 

    (73)

    • A. High-availability clusters      
    • B. Load-balancing clusters
    • C. Grid computing            
    • D. Cloud Computing
  4. ●The standard (IEEE 802) format for printing (72) in human-friendly form. is six groups of two hexadecimal digits, separated by hyphens (-) or colons (:), in transmission order, e.g. 01-23-45-67-89-ab, 01:23:45:67:89:ab. This form is also commonly used for EUI-64.

    (72)

    • A. hard disk logical block address 
    • B. IP address
    • C. mail address           
    • D. MAC address
  5. ● 若某小型信息系统开发团队由4人组成,则其沟通渠道数为(70)

    (70)

    • A. 12         
    • B. 10        
    • C. 8         
    • D. 6
  6.  ● In software engineering and systems engineering,(71) is a description of a system's behavior. as it responds to a request that originates from outside of that system. 

    (71)

    • A. black box       
    • B. business rule
    • C. use case            
    • D. traceability matrix
  7. ● 监理控制工程进度的措施不包括(67) 措施。

    (67)

    • A.组织      
    • B.技术  
    • C.信息管理    
    • D.知识产权管理
  8. ● 企业质量体系主要是满足(68)的需要。

    (68)

    • A.质量管理  
    • B.认证  
    • C.顾客        
    • D.认证与顾客
  9. ● 监理机构在实施信息化工程监理时,应对(64) 进行控制。

    (64)

    • A.施工质量、施工工期和施工成本
    • B.工程项目的功能、使用要求和质量
    • C.工程项目投资方向和投资结构
    • D.工程质量、工程工期和工程建设资金使用
  10. ● 项目监理机构应当根据(65)开展监理活动。

    (65)

    • A.项目法人的要求    
    • B.监理合同
    • C.监理大纲        
    • D.招标文件