● (75) is not the tool name for quality controlling used in the figure below.
(75)
● One tool that is useful during both analysis and design is the (72) ,which is a pictorial representation of the items of information(entities) within the system and the relationships between these pieces of information.
(72)
● (73) is one of the techniques used for estimating activity durations.
(73)
● Project Time Management includes the processes required to manage timely completion of the project, these processes interact with each other. (74) is following the process- Estimate Activity Durations.
(74)
● 项目协调的监理方法主要包括 (70) 。
①监理会议 ②监理报告 ③沟通 ④评审
(70)
● The connection between two networks to form. an internet is handled by a machine known as a (71) .
(71)
● 以下不属于沟通协调一般原则的是 (69) 。
(69)
● 从监理的角度来分类,以下不属于监理总控类文档的是 (68) 。
(68)
● 以下不属于物理访问控制要点的是 (65) 。
(65)
● 监理大纲是监理单位为了获得监理任务而编制的方案性文件, 其应由 (67) 批准。
(67)
2017年软考中级多媒体应用设计师模
2017年软考中级多媒体应用设计师模
2017年软考中级多媒体应用设计师模
2006年上半年《多媒体应用设计师》
2007年下半年《多媒体应用设计师》
2008年下半年《多媒体应用设计师》
2010年5月份软考《多媒体应用设计
2011年上半年多媒体应用设计师下午
2011年上半年多媒体应用设计师下午
2012年上半年软考《多媒体应用设计