● (75) is not the tool name for quality controlling used in the figure below.
(75)
● (75) is not the tool name for quality controlling used in the figure below.
(75)
● One tool that is useful during both analysis and design is the (72) ,which is a pictorial representation of the items of information(entities) within the system and the relationships between these pieces of information.
(72)
● (73) is one of the techniques used for estimating activity durations.
(73)
● Project Time Management includes the processes required to manage timely completion of the project, these processes interact with each other. (74) is following the process- Estimate Activity Durations.
(74)
● 项目协调的监理方法主要包括 (70) 。
①监理会议 ②监理报告 ③沟通 ④评审
(70)
● The connection between two networks to form. an internet is handled by a machine known as a (71) .
(71)
● 以下不属于沟通协调一般原则的是 (69) 。
(69)
● 从监理的角度来分类,以下不属于监理总控类文档的是 (68) 。
(68)
● 以下不属于物理访问控制要点的是 (65) 。
(65)
● 监理大纲是监理单位为了获得监理任务而编制的方案性文件, 其应由 (67) 批准。
(67)
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)