()seeks to build confidence that a future output or an unfinished output,will be completed in a manner that meets the specified requirements and expectations.
Projects are a mean of achieving organizational().
()represents the information assets characterized by such a High volume,Velocity and Variety to require specific Technology and Analytical Methods for its transformation into Value.
The life cycle of a project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,It is().
Cloud computing is a type of Internet-based computing that provides shared computer processing resources and data to computers and other devices on demand.Advocates claim that cloud computing allows companies to avoid up-front infrastructure costs.Cloud computing now has few service form,but it is not including().
项目经理在运行预算方案编制时,收集到的基础数据如下:工作包的成本估算为40万元;工作包的应急储备金为4万元;管理储备金为2万元。该项目的成本基准是()万元。
假设某IT服务企业,其固定成本为50万元,每项服务的可变成本为2000元/次,提供每项服务的价格为2500元/次,那么该企业的盈亏平衡点为()次。
下图标出了某产品从产地Vs到销地Vt的运输网,剪线上的数字表示这条输线的最大通过能力(流量)(单位:万吨/小时)。产品经过该运输网从Vs到Vt的最大运输能力可以达到()万吨/小时。
某企业生产甲、乙两种产品,其单位利润分别是300元、200元,该公司有两个机械加工中心Ⅰ和Ⅱ,它们每天工作的有效工时分别为20小时、18小时。甲、乙产品都需经过这两个中心加工,生产每单位产品甲在加工中心Ⅰ需要1小时,在加工中心Ⅱ需要3小时。生产每单位产品乙在加工中心Ⅰ和Ⅱ各需要2小时和1小时。根据市场调查,产品甲的日需求量不会超过5单位,产品乙则无论生产多少都能售完。利润最大的生产方案是()。
某机构拟进行办公自动化系统的建设,有四种方式可以选择:①企业自行从头开发;②复用已有的构件;③外购现成的软件产品;④承包给专业公司开发。针对这几种方式,项目经理提供了如下表所示的决策树。其中在复用的情况下,如果变化大则存在两种可能,简单构造的概率为0.2,成本约31万元;复杂构造的概率为0.8,成本约49万元。据此表,管理者选择建设方式的最佳决策是()。
2017年下半年系统规划与管理师考试
2017年下半年系统规划与管理师考试
2017年软考高级系统架构设计师模拟
2017年软考高级系统架构设计师模拟
2017年软考高级系统架构设计师模拟
2009年下半年《系统架构设计师》下
2009年下半年《系统架构设计师》下
2010年下半年软考系统架构设计师-
2010年下半年软考系统架构设计师-
2010年下半年软考系统架构设计师-