The following diagram denotes dependency between two activities A and B,It says()
Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resource
Establishing a project management timetable involves listing milestones,activities,and()with intended start and finish dates,of which the scheduling of employees may be an element
When multiple routers are used in interconnected networks,the routers exchange information about()using a dynamic routing protocol
wireless LAN,also widely known as WLAN or WIFI,is probably the most well-known member of the IEEE802 protocol family for home users today.It is standardized by()and shares many properties with wired Ethernet
.某公司拟将 5 百万元资金投放下属 A. B. C 三个子公司(以百万元的倍数分配投资),各子公司获得部分投资后的收益如下表所示(以百万元为单位)。该公司投资的总收益至多为()百万元。
某工程的进度计划网络图如下,其中包含了①~⑩10 个结点,节点之间的剪线表示作业及其进度方向,剪线旁标注了作业所需的时间(单位:周)。设起始结点①的时间为 0,则结点⑤的最早时间和最迟时间分别为()周
在一个单CPU的计算机系统中,采用按优先级抢占的进程调度方案,且所有任务可以并行使用I/O设备。现在有三个任务T1、T2和T3,其优先级分别为高、中、低,每个任务需要先占用CPU 10ms,然后再使用I/O设备13ms,最后还需要再占用CPU 5ms。如果操作系统的开销忽略不计,这三个任务从开始到全部结束所用的总时间为()ms
某信息系统集成项目包括 7 个作业( A~G),各作业所需的时间、人数以及各作业之间的衔接关系如图所示(其中虚线表示不消耗资源的虚作业)
如果各作业都按最早时间开始,那么正确描述该工程每一天所需人数的图为()
某水库现在的水位已超过安全线,上游河水还在匀速流入。为了防洪,可以利用其10个泄洪闸(每个闸的泄洪速度相同)来调节泄洪速度。经测算,若打开1个泄洪闸,再过10个小时就能将水位降到安全线;若同时打开2个泄洪闸,再过4个小时就能将水位降到安全线。现在抗洪指挥部要求再过1小时必须将水位降到安全线,为此,应立即同时打开()个泄洪闸。
2017年下半年系统规划与管理师考试
2017年下半年系统规划与管理师考试
2017年软考高级系统架构设计师模拟
2017年软考高级系统架构设计师模拟
2017年软考高级系统架构设计师模拟
2009年下半年《系统架构设计师》下
2009年下半年《系统架构设计师》下
2010年下半年软考系统架构设计师-
2010年下半年软考系统架构设计师-
2010年下半年软考系统架构设计师-