● The Estimate Activity Resource process is closely coordinated with the (73)process.
(73)
●Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.
(75)
● Estimating activity durations uses information on activity scope of (74),required resource types, estimated resource quantities, and resource calendars.
(74)
● Project work packages are typically decomposed into smaller components called activities to provide a basis for (72), scheduling, executing, and monitoring and controlling the project work.
(72)
● Define Activities is the process of identifying the specific actions tobe performed to produce the (71).
(71)
● 制造某种产品需要四道工序,每道工序可选用多种方法。下图列出了制造这种产品各道工序可选用的不同方法:从节点1开始,连续经过4条线段(表示4道工序所选用的方法),组成一条线路,直到节点12结束。每条线段上标记的数字表示利用相应方法每件产品可以获得的利润(元)。企业为了获取最大利润,需要找出从节点1到节点12的一条线路,使其对应的各道工序的利润之和达到最大。利用运筹方法计算后可知,制造每件产品可以获得的最大利润是 (70) 元。
(70)
● 某车间需要用一台车床和一台铣床加工 A、B、C、D 四个零件。每个零件都需要先用车床加工,再用铣床加工。车床和铣床加工每个零件所需的工时(包括加工前的准备时间以及加工后的处理时间)如下表。
若以 A、B、C、D 零件顺序安排加工,则共需 29 小时。适当调整零件加工顺序,可产生不同实施方案,在各种实施方案中,完成四个零件加工至少共需 (69) 小时。
(69)
● 某公司准备将新招聘的4名销售员分配到下属3个销售点甲、乙和丙。各销售点增加若干名销售员后可增加的月销售额如下表:
根据此表,只要人员分配适当,公司每月最多可以增加销售额(68)千元。
(68)
● (65)不属于建设工程监理规划的作用。
(65)
● 某工程包括 A、B、C、D、E、F、G 七个作业,各个作业的紧前作业、所需时间、所需人数如下表:
该工程的计算工期为(66)周。按此工期,整个工程至少需要(67)人。
(66)
2017年下半年系统规划与管理师考试
2017年下半年系统规划与管理师考试
2017年软考高级系统架构设计师模拟
2017年软考高级系统架构设计师模拟
2017年软考高级系统架构设计师模拟
2009年下半年《系统架构设计师》下
2009年下半年《系统架构设计师》下
2010年下半年软考系统架构设计师-
2010年下半年软考系统架构设计师-
2010年下半年软考系统架构设计师-