在对某项目采购供应商的评价中,评价项有:对需求的理解、技术能力、管理水平和企业资质等。假定每个评价项满分为10分,其中“管理水平”权重为20%。若4个评定人在 “管理水平”项的打分分别为7分、6分、8分、7分,那么该供应商的“管理水平”的单项综合分为(59)。
In approximating costs, the estimator considers the possible causes of variation of the cost estimates, including (75).
(73) was developed to make clear the interdependence between project tasks before those tasks are scheduled.
Project (74) Management is the Knowledge.Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, relrieval, and ultimate disposition of project information.
Results of quality control measurement are used (72).
以下关于项目总结的描述中,错误的是(70)。
Project work packages are typically decomposed into smaller components called activities to provide a basis for (71), scheduling, executing, and monitoring and controlling the project work.
在某系统集成项目风险管理中,项目经理老阮采用因果图和德尔菲技术对风险进行分析,这表明其正在进行(69)。
以下工程项目风险事件中,属于技术性风险因素的是(68)。
某项目的项目范围已经发生变更,因此成本基线也将发生变更,项目经理需要尽快(66)。
以下对风险的认识中,错误的是(67)。
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)