某大型网络工程项目的时标网络图如图1-1所示(时间单位:周)。在项目实施过程中,因负责某个子项目实施的网络工程师失误操作发生了质量事故,需整顿返工,造成②~④之间的作业拖后3周,受此影响,工程的总工期将会拖延(18)周。
(71)
(70)
(69)
(68)
IPv6 is short for "Internet Protocol Version 6". IPv6 is the "next generation" protocol designed by the IETF to(71) the current version Internet Protocol, IP version 4("IPv4").
Most of today's internet uses IPv4, which is now more than twenty years old. IPv4 has been(72) resilient in spite of its age, but it is beginning to have problems. Most importantly, there is a growing(73) of IPv4 addresses, which are needed by all new machines added to the Internet. IPv6 fixes a number of problems in IPv4, such as the(74) number of available IPv4 addresses. It also adds many improvements to IPv4 in areas such as routing and network autoconfiguration. IPv6 is expected to gradually replace IPv4, with the two coexisting for a number of years during a transition(75) .
通常,多项目管理从项目目标卜看,这些项目可能是孤立的、无关联的,但是这些项目之间的组织内部存在除(70)之外的共有特性。
在大型及复杂项目的实施与控制过程中,最关键的环节是(68)。
以下关于大型及复杂项目的计划过程的描述,错误的是(69)。
某项目年生产某种产品250万件,每件销售价为8元,可变单位成本5元,固定成本210万元,则该项目的盈亏平衡点销售额为(66)。
通常,大型及复杂项目的管理模式以间接管理为主。以下关于“间接管理”的描述中,正确的是(67)。
高级经济师考试试题精选练习(1)
高级经济师考试模拟练习题之单选题(1
高级经济师考试试题精选练习(2)
高级经济师考试试题精选练习(3)
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟试题及答案
高级经济师考试试题及答案:单选练习题
高级经济师考试试题:经济法案例试题精
高级经济师考试模拟题及答案练习(1)
高级经济师考试模拟题及答案练习(2)