If you are bunkering and you close off one tank in the line of tanks being filled,the rate of flow to other open tanks on the same line will ______.

  • A.increase
  • B.decrease
  • C.stop
  • D.remain constant
参考答案
查看试卷详情
相关试题
  1. To determine which grades of cargo a tank vessel is permitted to carry you should ______.

    • A.Refer to the vessel's Certificate of Inspection
    • B.Examine the cargo tanks and fittings
    • C.Ask the terminal supervisor or his representative
    • D.Check the loading order
  2. To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.

    • A.Slings or saddles placed at 25-foot(8 meter)intervals
    • B.Enough slack in their bight
    • C.Topping lifts and runners tied off to winches
    • D.All of the above
  3. The valve on the discharge side of a cargo pump on a tank vessel will usually be a ______.

    • A.butterfly valve
    • B.spectacle valve
    • C.check valve
    • D.globe valve
  4. The tanks should then be ______ immediately after the measurements or cargo samples have been taken.

    • A.topped up
    • B.braced
    • C.tommed down
    • D.re-pressurized
  5. The transfer procedures required to be followed on tankers shall contain ______.

    • A.A list of each port of discharge
    • B.A line diagram of the vessel's transfer piping
    • C.A current crew list
    • D.The duties by name of each person in charge required for each transfer operation
  6. The use of portable electrical equipment in the pumproom on tank barges is prohibited unless ______.

    • A.The pumproom is gas-free
    • B.Spaces with bulkheads common to the pumproom are either gas-free,inert,filled with water,or contain grade E liquid
    • C.All other compartments in which flammable vapors and gases may exist are closed and secured
    • D.All of the above
  7. The system of valves and cargo lines in the bottom piping network of a tanker that connects one section of cargo tanks to another section is called a ______.

    • A.come-along
    • B.crossover
    • C.manifold
    • D.runaround
  8. The shipping papers for the products being carried in your tanker are NOT required to contain the ______.

    • A.Exact quantity of the cargoes
    • B.Grades of the cargoes
    • C.Location of the delivery point(s)
    • D.Name of the consignee(s)
  9. The person in charge on the vessel and the person in charge at the facility must hold a meeting before starting the transfer of oil.Who must decide to start the transfer ________.

    • A.The person in charge on the vessel
    • B.The person in charge at the facility
    • C.Both persons in charge
    • D.The person in charge of either place that is doing the pumping
  10. The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.

    • A.The name of each person designated as the person in charge of transfer
    • B.A line diagram of the vessel's oil transfer piping
    • C.Special procedures for topping off tanks
    • D.A description of the deck discharge containment system