信息工程监理表格体系中,属于承建单位用表的是(68)。

  • A.工程合同评审表
  • B.合格供方名单
  • C.工程进度报表
  • D.工程进度计划检查表
参考答案
查看试卷详情
相关试题
  1. with a clear SOW a contractor completes work as specified,but the buyer is not pleased with the result.the contract is considered to be (75)

    • A.incomplete because the buyer is not pleased
    • B.incomplete because the specs are incorrect
    • C.compete because the contractor meets the terms and conditions of the contract
    • D.complete because the contractor is satisfied
  2. Schedule control is concerned with all the following except (74)

    • A.influencing the factors that create schedule changes to ensure that the changes are beneficial
    • B.determing that the schedule has changed
    • C.managing the actual changes when and as they occur
    • D.changing the shedule based on customer demands
  3. Cost of qunlity is (73)

    • A.primarily coused by poor workmanship of workers who are building or manufacturing the produce
    • B.associated with non-conformence to specifications and requirements
    • C.used to determine whether a quality management program is suitable for a given project
    • D.negligible for most large projects
  4. Ospf routing protocol typically runs over (72)

    • A.IP
    • B.TCP
    • C.UDP
    • D.ARP
  5. Since risk is associated with most projects,the best course of action is to (71)

    • A.cover all project risks by buying appropriate insurance
    • B.ignore the risks,since nothing can be done about them and move forward with the project in an expeditious manner
    • C.avoid project with clear and present risk
    • D.identify various risks and implement actions to mitigate their potential impact
  6. 在监理工程过程中,应当由(70)负责与建设工程有关的外部关系的组织协调工作。

    • A.监理单位
    • B.承建单位
    • C.建设单位
    • D.建设单位与监理单位共同
  7. 信息工程监理表格体系中,属于承建单位用表的是(68)。

    • A.工程合同评审表
    • B.合格供方名单
    • C.工程进度报表
    • D.工程进度计划检查表
  8. 监理实践中,监理工程师对核心问题有预先控制措施,凡事要有证据,体现(69)原则

    • A.公平
    • B.诚信
    • C.科学
    • D.独立
  9. 对于物理环境安全,监理单位应注意的问题,包括(65)。①硬件设施在合理的范围是否能防止强制入侵②计算机设备在搬动时是否需要设备授权通行的证明③智能终端是否上锁或有安全保护,以防止电路板、芯片或计算机被搬移④程序中是否被植入了木马

    • A.①②④
    • B.②③④
    • C.①②③
    • D.①②③④
  10. 信息系统工程建设信息中的(66)不是进度控制信息。

    • A.分目标进度
    • B.资金及物资供应计划
    • C.劳动力及设备的配置计划
    • D.工程预算