● 若一个网络系统中有150个信息点,按照EIA/TIA586标准进行结构化布线,则布线工程需要准备RJ45头的总量是 (20) 个。

(20)

  • A.600       
  • B.780      
  • C.618      
  • D.690
参考答案
查看试卷详情
相关试题
  1. ● Which statement about the preliminary design stage of a software development project is true? (75) .

    (75)

    • A.The preliminary design is an internal document used only by programmers
    • B.The preliminary design is the result of mapping product requirements info software and hardware functions
    • C.The preliminary design of the product comes from the requirement specification
    • D.The developers produce the preliminary design by defining the software structure in enough detail to permit coding
  2. ● You are a project manager for a small project. Your project was budgeted for ¥500,000 over a six-week period. As of today, you've spent ¥260,000 of your budget to complete work that you originally expected to cost ¥280,000. According to your schedule, you should have spent ¥300,000 by this point. Based on these circumstances, your project could be BEST described as (74) .

    (74)

    • A.Ahead of schedule    
    • B.Behind schedule
    • C.On schedule      
    • D.Having not enough information provided
  3. ● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .

    (72)

    • A.identifying individual tasks for a project   
    • B.scheduling the start of tasks
    • C.scheduling the end of tasks      
    • D.determining potential delays
  4. ● Sub-contractors should obey the contractor in information system project. When censoring sub-contractors, the supervisor mostly concerns about (73).

    (73)

    • A.Amount of subcontract       
    • B.qualifications and abilities of sub-contractors
    • C.responsibilities and obligations of sub-contractors  
    • D.the contents of the subcontract
  5. ● 以下做法正确的是(70) 。

    (70)

    • A.承建单位要求项目暂停实施,总监理工程师签发“停工令”
    • B.由于出现项目质量问题,必须进行停工处理,总监理工程师签发“停工令”
    • C.发生必须暂停实施的紧急事件,总监理工程师代表签发“停工令”
    • D.发生需要停工事件,但建设方暂不允许项目暂停,总监理工程师不签发“停工令”
  6. ● 10BaseT is an Ethernet LAN term meaning a maximum transfer rate of 10Mbps that uses baseband signaling and twisted pair cabling. A 10BaseT Ethernet LAN has a (71) topology.

    (71)

    • A.star    
    • B.ring      
    • C.bus     
    • D.none of the above
  7. ● 在监理组织协调过程中,以下行为,(69)不能够较好体现公平、公正、独立的原则。

    (69)

    • A.监理单位不能同时既做信息系统工程的监理,又做系统集成业务
    • B.处理监理业务一定要有可靠的依据和凭证
    • C.遵守建设方的有关行政管理、经济管理、技术管理等规章制度及要求
    • D.处理实际监理事务中,要有大局观,要全面地分析和思考
  8. ● 根据《国家电子政务工程项目档案管理暂行办法》,下列文档中,(68)不必列入电子政务验收文档范围。

    (68)

    • A.中标通知书      
    • B.未中标的投标文件  
    • C.工程批复  
    • D.承建单位内部管理文件
  9. ● 工程监理验收报告主体内容应包括(67) 。

    (67)

    • A.工程建设情况总结     
    • B.工程验收测试结论与分析
    • C.工程监理执行情况总结    
    • D.工程建设过程及成果
  10. ● 信息系统安全管理体系中,数据安全的目标不包括(64) 。

    (64)

    • A.防止数据丢失         
    • B.防止数据崩溃
    • C.防止系统之间数据通信的安全脆弱性威胁   
    • D.防止数据被非法访问